Welland Canal: Difference between revisions

Jump to navigation Jump to search
Line 52: Line 52:
=== Railroad tracks ===
=== Railroad tracks ===
* [https://en.wikipedia.org/wiki/Trillium_Railway The Trillium Railway was discontinued in 2019]
* [https://en.wikipedia.org/wiki/Trillium_Railway The Trillium Railway was discontinued in 2019]
* Going south, there are 11 railroad tracks along the trail.  
* Going south, there are 11 railroad tracks along the trail perfectly set for nose dives.
* The 4 first railroad tracks are made of wood. The next 2, plastic, the next 4 are asphalt and the last one plastic
* The 4 first railroad tracks are made of wood. The next 2, plastic, the next 4 are asphalt and the last one plastic
* While half of the rail tracks can be rolled over with 100 mm wheels, provided that enough speed is given, none should attempted with smaller wheels.
* While half of the rail tracks can be rolled over with 100 mm wheels, provided that enough speed is given, none should attempted with smaller wheels.

Navigation menu