Welland Canal: Difference between revisions

Jump to navigation Jump to search
Line 9: Line 9:


== Currently ==
== Currently ==
Thursday, May 25, 2023, at 10:17 am, 86 km were done in the next 4 hours and 28 minutes. Average speed was 19.5 km/h with normal peak at 25 km/h and higher speeds passing the 40's.
This was a skate session for the stats
* Thursday, May 25, 2023, at 10:17 am, 86 km were done in the next 4 hours and 28 minutes.  
* Average speed was 19.5 km/h with normal peak at 25 km/h and higher speeds passing the 40's.


== Parking ==
== Parking ==

Navigation menu