Welland Canal: Difference between revisions

Jump to navigation Jump to search
No edit summary
Line 47: Line 47:
=== Railroad tracks ===
=== Railroad tracks ===
* Going south, there are 10 rail tracks along the trail.  
* Going south, there are 10 rail tracks along the trail.  
* The 4 first ones are made of wood. The nest 2, plastic, the next 3 are asphalt and the last one plastic
* The 4 first ones are made of wood. The next 2, plastic, the next 3 are asphalt and the last one plastic
* While half of the rail tracks can be rolled over with 100 mm wheels, provided that enough speed is given, none should attempted with smaller wheels.
* While half of the rail tracks can be rolled over with 100 mm wheels, provided that enough speed is given, none should attempted with smaller wheels.


Navigation menu